The project integrates station structures, diaphragm walls, and associated ancillary works, with construction methods and excavation sequencing carefully planned according to site conditions to ensure safety and stability throughout execution. Construction is carried out while maintaining uninterrupted metro operations and urban traffic flow, coordinating earthworks, structural works, waterproofing and drainage, and architectural finishes, alongside landscape and surrounding environment restoration—demonstrating comprehensive integration and execution capability in major underground infrastructure projects.
Kaohsiung Mass Rapid Transit Orange Line C04 Project
A large-scale underground cut-and-cover station project integrating deep excavation expertise with complex urban interface coordination to deliver a four-level subterranean metro interchange hub.